10.17.04
Completed Girder Installation
With the help of a homeade crane, we have completed installation of the girders for the rear section of the second floor. We hope to finish installation of the girders over the hallway in 1 or 2 weeks. The next step will be to lay some plywood and begin assembly of the gables, beginning with the right side (the side with two floors), then the front, and finally the left (auditorium) side.
