The HVAC contractor is awaiting an inspection before installing the units. All of the duct work and wiring has been run for 3 large air conditioners that will be installed on the deck that was completed in December.
The electrician has been installing the wiring and is nearly complete. He estimated 3 more days of work.
We have been installing the trim on the windows. The pictures make the work look simple, as the finish trim only shows for wide boards; however, we put a lot of prep into the windows before we install the trim. Due to the varied thickness of the logs, we must chisel away logs that are too thick, and add shims in places to make the window frame match the width of the wall.
Everyone here is dong well and we often talk about our friends from, well, all over.
Thank you for all of your love and prayers!