		<title>Fall Update</title>
		<description><![CDATA[This summer has flown by.  Work has been proceeding on the building.  We had a new well dug and built a new heavy duty pump house out of brick.
This summer, all of our mechanical contractors have passed inspection: Electrical, Plumbing and HVAC duct work.  We needed to sheath the dormers on the rear of the [...]]]></description>
		<link>http://edistochurch.org/2009/11/fall-update/</link>
			</item>
	<item>
		<title>Winter Update</title>
		<description><![CDATA[The HVAC contractor is awaiting an inspection before installing the units.  All of the duct work and wiring has been run for 3 large air conditioners that will be installed on the deck that was completed in December.
The electrician has been installing the wiring and is nearly complete.  He estimated 3 more days of work.
We [...]]]></description>
		<link>http://edistochurch.org/2009/02/winter-update/</link>
			</item>
	<item>
		<title>We’re still making progress</title>
		<description><![CDATA[I have not updated the site here because it seems as though this year, especially this summer has flown by!  We appreciate all of you who keep up with the progress of the building and we are grateful for your prayers.
We have reached the point of working on interior finish work.  We recently began framing [...]]]></description>
		<link>http://edistochurch.org/2008/12/were-still-making-progress/</link>
			</item>
	<item>
		<title>Decks completed! Parking lot graded!</title>
		<description><![CDATA[We have finished the railings on the decking and the contractor has done the early grading on the parking lot.  After the other heavy construction (septic tank and well digging) are done, he will do the final grading and place the parking bumpers.  We chose to lay shell sand for the parking lot.  Shell sand [...]]]></description>
		<link>http://edistochurch.org/2008/07/decks-completed-parking-lot-graded/</link>
			</item>
	<item>
		<title>Latest Update</title>
		<description><![CDATA[The college group from the Central congregation in Johnson City, Tennessee, visited the first week of May. They helped us completed several of the hand rails that we are building. I have added some pictures of these. Also included are pictures of the new vents that we installed in April.
Things are progressing normally.  As [...]]]></description>
		<link>http://edistochurch.org/2008/06/latest-update/</link>
			</item>
	<item>
		<title>Overdue update</title>
		<description><![CDATA[It is inexcusable that I have not posted an update for more than six months! I do apologize and have no excuse other than to say that I was doing something I was good at: procrastinating.
A lot has happened since my last update:
Toward the end of summer, we put our perpetual task of making handrails [...]]]></description>
		<link>http://edistochurch.org/2008/02/overdue-update/</link>
			</item>
	<item>
		<title>Long Awaited Update</title>
		<description><![CDATA[I know all of you have been waiting on news from the congregation here in Edisto…  I apologize for taking so long.  In this case, no news is good news.  We have been steadily working on the building here, adding to the handrails.  Last week (the first week in July) we worked with the youth [...]]]></description>
		<link>http://edistochurch.org/2007/07/long-awaited-update/</link>
			</item>
	<item>
		<title>Still here</title>
		<description><![CDATA[We are still working on the building.  We have completed the fire escape and handicap access decking and are now working on the hand rails for these.  There is not much other news to report.  I hope to have some more pictures up very soon.
]]></description>
		<link>http://edistochurch.org/2007/04/still-here/</link>
			</item>
	<item>
		<title>Where have we been?</title>
		<description><![CDATA[I wanted to take a moment to check in and tell you what we have been doing since my last post in July. Shortly after the roof was finished, we began the task of building the handicap access ramp and fire escape system.
This was very interesting work! Each post that supports the decking had to [...]]]></description>
		<link>http://edistochurch.org/2006/11/where-have-we-been/</link>
			</item>
	<item>
		<title>The roof is complete!</title>
		<description><![CDATA[This week the roofers finished installing the roof.
]]></description>
		<link>http://edistochurch.org/2006/07/the-roof-is-complete/</link>